Beekman Point Engineering was the Prime Designer of Record for the mechanical, electrical, plumbing, and fire protection on a 10,600 SF medical facility renovation. HVAC designs incorporated enhanced filtration, humidity control, and regulated outside air to support infection control requirements. Electrical upgrades included 208V, 3-phase power distribution, emergency generator integration, and IT infrastructure serving critical medical equipment. Fire alarm and sprinkler system designs were coordinated to ensure life-safety compliance and constructability.
COMPLETE & COMPLIANT DESIGN ON TIME, EVERY TIME
Contact us today to schedule a consultation, and let's embark on a journey to deliver excellence in healthcare solutions together!